Block Machine Power Supply: What the Motor Needs

The same machine that runs on a domestic connection in one yard needs a three-phase supply in another, and the difference is in the nameplate rather than in the machine's size. This guide sets out what each model in the range actually draws, what changes as the figure rises, and the five things to confirm before the order is placed — because a power supply that does not match is discovered on commissioning day, not before.

By Alex, RENFA
Last reviewed 2026-11-09 · 5 min read

From 1.1 kW to 6.3 kW — the spread decides everything

The range is not uniform. The R2-45 and R3-45 draw 1.1 kW. The R4-45 draws 3.7 kW. The R4-35A and R4-35AH draw 4.8 kW. The R4-35B and R4-35BH draw 6.3 kW.

That is a factor of nearly six between the smallest and the largest, and it is the single number that determines whether a yard can run the machine on what it already has. A buyer who compares two models on output alone, without comparing the power figure, is comparing half the decision.

Output and draw are not proportional: the R4-35B produces the same 15,000 bricks per shift as the R4-35A while drawing 6.3 kW instead of 4.8 kW. Comparing two models on output alone will not tell you which one your supply can carry.

380 V or 220 V — read the nameplate, not the brochure

The machines are specified at 380 V / 220 V. Which one applies to your unit is set at the order, and it is written on the nameplate. Confirm it in writing before shipment, because rewiring a machine after it crosses a border is expensive and avoidable.

Frequency matters as much as voltage. A machine built for one frequency does not simply run slower on another — the motor's speed, the vibration characteristics and the load all change. Give the supplier your grid's voltage and frequency together, as one specification.

Single phase or three phase

At 1.1 kW — the R2-45 and R3-45 — a single-phase supply is practical, which is why these two models are the ones that appear in yards without an industrial connection.

At 3.7 kW and above, the phase question becomes a capacity question: what matters is whether the supply can carry the starting load without dropping. A 6.3 kW machine on a domestic connection is not a marginal case; it is a different installation.

If your site has no three-phase, the honest options are: choose a smaller model, install a supply, or take the diesel version. Deciding this after the machine arrives is the most expensive of the four.

The diesel option removes the question

The RD2-45 runs on an 8 hp diesel engine and needs no power supply at all — it is self-powered. For a yard with no connection, or one where the supply is unreliable enough that a stoppage costs more than the fuel, this removes the entire electrical decision.

The trade is that fuel, servicing and noise move from the grid to you. The diesel model produces 3,600 standard bricks per shift, the same as the 1.1 kW R2-45, so the choice between them is about power availability rather than output.

What a 6.3 kW machine needs that a 1.1 kW one does not

Three things change as the figure rises: the cable, the protective device, and the starting load.

The cable has to carry the running current over the distance from the supply to the machine, and voltage drop over a long run is often the reason a machine that works on a test bench underperforms in a yard.

The starting load is the number that catches people out. A motor draws far more at start than while running, and a supply sized only against the running figure will trip or dim the neighbourhood every time the machine starts. Give your electrician both figures, not just the kW rating.

If you are running on a generator

Size the generator against the starting load, not the running load. A generator that matches the running kW exactly will stall or trip when the motor starts, and the symptom — the machine runs for a second and stops — looks like a machine fault.

Two further points: the generator's voltage and frequency have to match the machine's nameplate, and the machine should be started with the vibration cycle unloaded where the control allows it. Both reduce the surge.

When the grid is the weak part

Unstable voltage damages motors in a way that does not show up immediately. A motor run repeatedly below its rated voltage draws more current for the same work, and the heat accumulates in the winding.

If your area has frequent outages or visible dimming when machinery starts, the practical measures are a voltage stabiliser sized for the machine, or a generator, or choosing a model with a lower draw. Measuring the supply before the machine arrives is cheaper than diagnosing a burnt winding afterwards.

Before you order: five things to confirm

One: the voltage and frequency of your supply, written down, not remembered. Two: whether it is single or three phase. Three: the capacity available at the point where the machine will stand, not at the meter.

Four: the distance from that point to the machine, because it sets the cable and the voltage drop. Five: what happens during an outage — whether you stop, switch to a generator, or have chosen a model that does not depend on the grid.

Answer those five and the model choice follows. Skip them and the choice is made for you by whichever machine happens to be available.

Common questions

Can the machine run on single phase?

At 1.1 kW — the R2-45 and R3-45 — a single-phase supply is practical. At 3.7 kW and above the question becomes whether the supply can carry the starting load without dropping, which is a capacity question rather than a phase one.

Do I need a generator?

Only if the grid cannot carry the machine or is unreliable enough that stoppages cost more than fuel. If you do use one, size it against the starting load rather than the running kW, or it will trip when the motor starts.

What voltage does the machine ship with?

380 V or 220 V, set at the order and written on the nameplate. Confirm voltage and frequency together in writing before shipment — frequency matters as much as voltage, and neither is cheap to change after the machine crosses a border.

Does the diesel version need any power supply?

No. The RD2-45 runs on its own 8 hp diesel engine and is self-powered, producing 3,600 standard bricks per shift — the same output as the 1.1 kW R2-45.

Talk to us about this

Send the specification you have arrived at and we will confirm which model of ours matches it, with the price and the packing weight.

More buying guides

Preparing a Site for a Block Machine

What to have ready before a block machine arrives: the surface it stands on, delivery access, the power connection, mix storage and curing space.

4 min read

How to Compare Two Block Machine Quotations

Two quotations that look different usually are not. What to put on the same basis — price terms, moulds, voltage, spares and installation — before you decide.

4 min read

How to Choose a Block Making Machine

Cycle time, drive power, mould configuration and power supply — the four decisions that set the output and cost of a block making machine before you order.

6 min read

Get a specification confirmed, not a brochure

Send the requirement you have worked out — capacity, power supply, bar size or slab area — and we will confirm the model, the price and the packed weight.

WhatsApp / WeChat+86 189 0384 2606
ResponseQuotations sent within one working day