What is in the crate besides the machine
Every model in the range ships with one mould box included. That is not a detail — the mould box is a steel assembly roughly the footprint of the machine, and it adds both weight and volume that a shipping quote based on the machine alone will miss.
Alongside the machine and its mould you are shipping the control panel, the vibration motors as fitted, and a small spares set. Spares that are ordered later travel as a separate consignment, which is why the first order is the cheaper moment to include them.
Weights and dimensions across the range
These are the published figures. The first number is what the machine weighs; the second is the footprint it occupies before crating.
R2-45 small mobile — 200 kg, 900 × 700 × 1,100 mm. R3-45 directly mobile — 300 kg, 1,100 × 1,050 × 1,300 mm. RD2-45 diesel mobile — 250 kg, 1,900 × 1,000 × 1,550 mm. R4-45 large mobile — 750 kg, 1,250 × 1,350 × 1,550 mm.
R4-35A — 750 kg, 1,250 × 1,350 × 1,550 mm. R4-35B — 800 kg, same footprint. R4-35AH — 780 kg, 1,200 × 1,280 × 1,950 mm. R4-35BH — 830 kg, same footprint as the AH.
The two hopper models are taller rather than wider. That matters for container height and for the door you will eventually push them through.
Which container the range fits
Work from volume, not from a rule of thumb. A bare R2-45 occupies about 0.7 m³; an R4-35BH occupies about 3.0 m³. A 20-foot container holds roughly 28 m³ of usable space and a 40-foot about 58 m³.
Those figures are for the machine alone. Crating adds to each dimension, by an amount that depends on how the machine is braced, and the mould box travels as a separate item. Two R4-35BH machines plus crates and moulds will not fit a 20-foot container comfortably, even though the arithmetic on bare volume suggests it might.
The practical rule: ask for a loading plan against the specific models and quantities, and treat any quote that gives a container count without those numbers as provisional.
How it is crated
A machine of this type travels in a timber crate on a skid base, not on a pallet. The base has to carry the full weight through the corners, because a crate that sags in the middle puts the load into the machine frame instead of the floor.
Inside, the machine is braced against movement and the machined surfaces — mould faces, guide pins, the ejector — are protected. Vibration motors and the control panel are the parts most often damaged in transit, and they are the parts to look at first on arrival.
Ask for photographs of the packed crate before it leaves. It is the cheapest insurance available: a photo of the bracing tells you more about how a claim will go than any wording on the invoice.
Loading at origin
At 200 to 300 kg, an R2-45 or RD2-45 can be moved by a small forklift or a pallet truck. At 750 to 830 kg, the R4 range needs either a forklift rated above the load or a crane with slings on the marked lifting points.
The number to give your freight forwarder is the crated weight, not the machine weight. A 830 kg machine in a braced crate with a mould box alongside is a different lift.
Unloading at your yard
This is where most deliveries go wrong, and it is entirely predictable from the weight. An R2-45 at 200 kg can be walked off a tailgate by three or four people with rollers. An R3-45 at 300 kg is at the limit of what manual handling should attempt.
From 750 kg upward — R4-45, R4-35A, R4-35B, R4-35AH, R4-35BH — you need a forklift, a crane, or a ramp and winch. Arrange it before the container arrives, not when the driver is waiting. A machine dropped from a tailgate is not a warranty matter.
If your site has no hard standing for a forklift, say so at the quotation stage. The unloading method changes the crate design.
Documents that travel with it
The commercial invoice, packing list and bill of lading are the baseline. The packing list must break out machine, mould box and spares separately, because customs assesses them and because a missing line is a missing item at the other end.
For Nigeria, a SONCAP certificate has to be in place before shipment, not on arrival — the process starts with the exporter and the importer together. The SONCAP guide on this site sets out the steps and who does what.
Keep one set of documents in the crate and one set with you. A container held at port for a missing paper costs more than the paper.
What to inspect before you sign
Check the crate before it is opened: broken bracing, water staining, or a base that has shifted tells you what happened in transit. Photograph it before anything is cut.
Then check the machine against the packing list — model, mould box, spares. Look at the vibration motors and the control panel first, then the mould faces and guide pins for impact damage.
Sign for damage on the delivery note at the time, not afterwards. A note that says the crate was received in good order is very hard to argue with later, whatever the photographs show.
Common questions
How much does a block machine weigh?
From 200 kg for the R2-45 to 830 kg for the R4-35BH. The R3-45 is 300 kg, the RD2-45 diesel is 250 kg, and the R4-45, R4-35A and R4-35B are 750 to 800 kg. Use the crated weight for freight, not the machine weight.
Can two machines share one container?
It depends on the models, because crating and the mould box add volume that bare machine dimensions do not show. Ask for a loading plan against the specific models and quantities rather than a container count given without those numbers.
Does the machine arrive assembled?
The main assemblies travel assembled and braced in the crate. The mould box ships as a separate item and is fitted on site, which is also when the machine is levelled on its foundation.
What if the machine arrives damaged?
Photograph the crate before it is opened and note the damage on the delivery note at the time of signing. A note recording the crate as received in good order is very hard to argue with afterwards, whatever the photographs show.